Middle Road Bridge Replacement
over Brown’s Creek

Sayville, NY

LKB is preparing both the preliminary and final design of this 28-foot-long, concrete T-beam bridge which carries Middle Road over Brown’s Creek. Elements for this project included bridge and diving inspection, coring and material testing, load rating, scour analysis, bridge evaluation, and recommendations. Preliminary and final design will include environmental permitting, preliminary and final contract document preparation, and construction support for the replacement of the bridge.