LKB completed preliminary and final design phases (I-VI), and provided construction support services for this federally funded project, which consisted of the reconstruction of approximately one mile of a heavily traveled two lane downtown roadway in Yonkers, NY.
The preliminary design included survey and mapping, inspection/evaluation of a bridge over the Saw Mill River, soils investigation, development of design alternatives, inspection/ evaluation of the bridge over the Nepperhan River, public information meetings, environmental assessment, traffic analysis, and the development of a Design Approval Document (DAD).
The final design and preparation of contract documents for the reconstruction and improvement of the roadway included: