LKB prepared Construction documents for the rehabilitation of a reinforced concrete floor system and entranceway walls for the regional machine shop located at Belmont Lake State Park’s Commission Headquarters. An in-depth, hands-on inspection of the floor system was conducted, including concrete coring and testing, to identify areas of concrete deterioration and delamination. LKB analyzed the floor system digitally to establish its structural integrity. Repair designs included overhead patching, welded and mechanical splices of rebars, and full-depth reconstruction.