LKB prepared plans, specifications and cost estimates for the rehabilitation of five pump stations that were damaged by Superstorm Sandy. The NCDPW stations range in size from 200 GPM to 1,000 GPM. Work efforts include the replacement of emergency generators, sewage pumps, sump pumps, odor control systems, gas detection systems and unit heaters. In addition, a reinforced concrete wall and flood-proof doors were designed to withstand higher flood elevations.