Replacement of Electrical Feeds on Newburgh-Beacon Bridge

LKB provided final design and preparation of contract documents for the replacement of electrical power feeds on the Newburgh Beacon Bridge. Work included field verifications, installation of a new cable rack and cables, replacement of distribution feeds to lights, traffic control, navigation lights and aerial beacons, automatic transfer switches and service outlets. Installation of an emergency generator, conduit runs from the administration building to the new cable rack on the bridge and mini-power control centers were also included in the project.

Services Provided

Electrical & Mechanical Engineering, Structural Engineering / Bridge Design

Location

Newburgh, NY

Client

New York State Bridge Authority

Completion

2012

Print Friendly, PDF & Email