This project involved the reconstruction of the full length of Route 108. The project included two inches of milling of the existing asphalt surface, isolated full depth pavement repairs, two inches of hot mix asphalt overlay, new pavement markings, sign installations, and traffic signal loops. Also included was the rebuilding of a culvert and headwalls, repair of existing drainage structures, replacement of drainage frames and grates, and cleaning of the existing drainage system.